Name:
Number:

Kevin Stewart, MD of Mass Participation Events:

“As a Director of the London & Blenheim Triathlons I've worked with Chris Murphy since 2002 and have since contracted Pontoonworks for both our flagship events to provide entry and exit swim platforms. I would be pleased to recommend Chris and Pontoonworks. They are a keen, willing, professional team; ensuring a safe, secure and reliable service.”

Certification

We met the GIFFORD team on a prestigious society project in 2009. Their enthusiasm for what we are able to provide on water has enabled us to validate our service way beyond the manufacturer's guarantees, which incidentally have run for an unblemished 40 years.

As part of our comprehensive service we now use a stress testing package designed with state of the art technology used for bridge engineering and design.  With this ability to measure technical forces and strains posed by various marine environments our service can accommodate more complex installations. The data is specific to the Jetfloat system and can demonstrate the performance of your installation.





Please phone 01935 814 950 or email office@pontoonworks.co.uk for advice.

Design by Arnold Jones Associates