Name:
Number:

Jim Evans of Ceredigion Council:

“Since the installation of the pontoon our fleet has trebled and the pontoon has not moved an inch."

Small Diggers & Plant

Pontoon used during Hatton Lock replacement works for British Waterways

With buoyancy of 350kgs per square metre we can build a pontoon to support machinery from 100kgs up to 20 tonnes.

The secret of any plant evolution is ensuring that the point loading of the equipment is understood. We ensure that the loading of heavy plant is evenly distributed by covering the pontoon surface with a range of tracking. We understand the risks involved and always supply pontoons that will have a minimum of a 50% safety margin.


Please phone 01935 814 950 or email office@pontoonworks.co.uk for advice.

Design by Arnold Jones Associates